瀏覽 的方式: 作者 Chung, S. H.
顯示 1 到 7 筆資料,總共 7 筆
| 公開日期 | 標題 | 作者 |
| 1-一月-2007 | A comparison of two methods for transforming non-normal manufacturing data | Chung, S. H.; Pearn, W. L.; Yang, Y. S.; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 2008 | The Design of Outsourcing Planning for Semiconductor Backend Turnkey Service | Chung, S. H.; Chung, I. P.; Tai, Y. T.; Chu, Y. M.; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-五月-2007 | Due-date assignment for wafer fabrication under demand variate environment | Pearn, W. L.; Chung, S. H.; Lai, C. A.; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-七月-2009 | An Effective Scheduling Approach for Maximizing Polyimide Printing Weighted Throughput in Cell Assembly Factories | Chung, S. H.; Tai, Y. T.; Pearn, W. L.; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-七月-2009 | Fast and effective algorithms for the liquid crystal display module (LCM) scheduling problem with sequence-dependent setup time | Chung, S. H.; Pearn, W. L.; Tai, Y. T.; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 2009 | Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes | Chung, S. H.; Tai, Y. T.; Pearn, W. L.; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-四月-2007 | Scheduling integrated circuit assembly operations on die bonder | Pearn, W. L.; Chung, S. H.; Lai, C. M.; 工業工程與管理學系; Department of Industrial Engineering and Management |