| 公開日期 | 標題 | 作者 |
| 1-十一月-2004 | Algorithms for the wafer probing scheduling problem with sequence-dependent set-up time and due date restrictions | Pearn, WL; Chung, SH; Yang, MH; Chen, YH; 交大名義發表; National Chiao Tung University |
| 18-四月-2005 | Analytic network process (ANP) approach for product mix planning in semiconductor fabricator | Chung, SH; Lee, AHI; Pearn, WL; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-十二月-1999 | The block-based cycle time estimation algorithm for wafer fabrication factories | Chung, SH; Huang, HW; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 18-四月-2004 | A case study on the multistage IC final testing scheduling problem with reentry | Pearn, WL; Chung, SH; Chen, AY; Yang, MH; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-一月-2002 | A case study on the wafer probing scheduling problem | Pearn, WL; Chung, SH; Yang, MH; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-四月-2005 | Control wafers inventory management in the wafer fabrication photolithography area | Chung, SH; Pearn, WL; Kang, HY; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-二月-2002 | Cycle time estimation for wafer fab with engineering lots | Chung, SH; Huang, HW; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-九月-2005 | The integrated circuit packaging scheduling problem (ICPSP): A case study | Pearn, WL; Chung, SH; Yang, MH; Chen, CY; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-一月-2003 | Job order releasing and throughput planning for multi-priority orders in wafer fabs | Chung, SH; Pearn, WL; Lee, AHI; Ke, WT; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-二月-2005 | A linear programming model for the control wafers downgrading problem | Chung, SH; Pearn, WL; Kang, HY; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-二月-2002 | Minimizing the total machine workload for the wafer probing scheduling problem | Pearn, WL; Chung, SH; Yang, MH; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-六月-2005 | Product mix optimization for semiconductor manufacturing based on AHP and ANP analysis | Chung, SH; Lee, AHI; Pearn, WL; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 2005 | The scheduling for parallel machines with periodic maintenance and setup activities | Chung, SH; Tai, YT; Tsai, PH; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-九月-2005 | A service level model for the control wafers safety inventory problem | Chung, SH; Kang, HY; Pearn, WL; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-一月-1998 | The TOC-based algorithm for solving product mix problems | Hsu, TC; Chung, SH; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-一月-1998 | The TOC-based algorithm for solving product mix problems | Hsu, TC; Chung, SH; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 2004 | A tool portfolio elimination mechanism (TPEM) for a wafer fab | Chung, SH; Hsieh, MH; Liu, JC; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 2006 | Using constraint satisfaction approach to solve the capacity allocation problem for photolithography area | Chung, SH; Huang, CY; Lee, AHI; 工業工程與管理學系; Department of Industrial Engineering and Management |
| 1-八月-2002 | The wafer probing scheduling problem (WPSP) | Pearn, WL; Chung, SH; Yang, MH; 工業工程與管理學系; Department of Industrial Engineering and Management |