Skip navigation
Browse
Items
Issue Date
Author
Title
Subject
Researchers
English
繁體
简体
You are Here:
National Chiao Tung University Institutional Repository
Browsing by Author Pearn, W. L.
Jump to:
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
or enter first few letters:
Sort by:
title
issue date
submit date
In order:
Ascending
Descending
Results/Page
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
Authors/Record:
All
1
5
10
15
20
25
30
35
40
45
50
Showing results 1 to 20 of 110
next >
Issue Date
Title
Author(s)
2007
Accuracy analysis of the percentile method for estimating non normal manufacturing quality
Wu, Chien-Wei
;
Pearn, W. L.
;
Chang, C. S.
;
Chen, H. C.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
4-Jul-2019
An analytical closed-form solution for multiple line supplier selection problem
Pearn, W. L.
;
Tai, Y. T.
;
Tseng, S. C.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Mar-2012
ANALYTICAL METHOD FOR ACCURACY ANALYSIS OF THE RANDOMIZED T-POLICY QUEUE
Wang, Kuo-Hsiung
;
Yang, Dong-Yuh
;
Pearn, W. L.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Nov-2014
Approximately Unbiased Estimator for Non-Normal Process Capability Index C-Npk
Pearn, W. L.
;
Tai, Y. T.
;
Hsiao, I. F.
;
Ao, Y. P.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
17-Sep-2013
Assessing Profitability of a Newsboy-Type Product with Normally Distributed Demand Based on Multiple Samples
Su, Rung-Hung
;
Yang, Dong-Yuh
;
Pearn, W. L.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
3-Aug-2015
Assessing the actual Gamma process quality - a curve-fitting approach for modifying the non-normal flexible index
Liao, Mou-Yuan
;
Pearn, W. L.
;
Liu, Yen-Lun
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
2016
A Bayesian approach for group supplier selections based on the popular process-capability-index C-pk
Wu, Chin-Chieh
;
Shiau, Jyh-Jen Horng
;
Pearn, W. L.
;
Hung, Hui-Nien
;
統計學研究所
;
工業工程與管理學系
;
Institute of Statistics
;
Department of Industrial Engineering and Management
1-Nov-2006
Bayesian approach for measuring EEPROM process capability based on the one-sided indices C-PU and C-PL
Wu, Chien-Wei
;
Pearn, W. L.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
2008
Bootstrap approach for supplier selection based on production yield
Wu, C. -W.
;
Shu, M. H.
;
Pearn, W. L.
;
Liu, K. H.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Jul-2014
Box-Cox Transformation Approach for Evaluating Non-Normal Processes Capability Based on the C-pk Index
Wu, C. H.
;
Lin, S. J.
;
Yang, D. L.
;
Pearn, W. L.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
15-Mar-2013
The burn-in test scheduling problem with batch dependent processing time and sequence dependent setup time
Pearn, W. L.
;
Hong, J. S.
;
Tai, Y. T.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Dec-2008
Capability adjustment or gamma processes with mean shift consideration in implementing Six Sigma program
Hsu, Ya-Chen
;
Pearn, W. L.
;
Wu, Pei-Ching
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Dec-2011
Capability Assessment for Processes with Multiple Characteristics: A Generalization of the Popular Index C(pk)
Pearn, W. L.
;
Shiau, J. -J. H.
;
Tai, Y. T.
;
Li, M. Y.
;
統計學研究所
;
工業工程與管理學系
;
Institute of Statistics
;
Department of Industrial Engineering and Management
1-Dec-2011
Capability Assessment for Processes with Multiple Characteristics: A Generalization of the Popular Index C-pk
Pearn, W. L.
;
Shiau, J. -J. H.
;
Tai, Y. T.
;
Li, M. Y.
;
統計學研究所
;
工業工程與管理學系
;
Institute of Statistics
;
Department of Industrial Engineering and Management
1-Jul-2013
A Close Form Solution for the Product Acceptance Determination Based on the Popular Index C-pk
Pearn, W. L.
;
Wu, C. H.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Aug-2011
Comparative analysis of a randomized N-policy queue: An improved maximum entropy method
Wang, Kuo-Hsiung
;
Yang, Dong-Yuh
;
Pearn, W. L.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
2009
A comparison of methods for estimating loss-based capability index
Wu, Chien-Wei
;
Shu, Ming-Hung
;
Pearn, W. L.
;
Cheng, Feng-Tsung
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Jan-2007
A comparison of two methods for transforming non-normal manufacturing data
Chung, S. H.
;
Pearn, W. L.
;
Yang, Y. S.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Jun-2010
Comparison of two randomized policy M/G/1 queues with second optional service, server breakdown and startup
Wang, Kuo-Hsiung
;
Yang, Dong-Yuh
;
Pearn, W. L.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Jul-2015
Convenient Ratio Approach for Industrial Implementation in Estimating and Testing Process Yield
Pearn, W. L.
;
Tai, Y. T.
;
Kao, C. M.
;
統計學研究所
;
工業工程與管理學系
;
Institute of Statistics
;
Department of Industrial Engineering and Management