Skip navigation
Browse
Items
Issue Date
Author
Title
Subject
Researchers
English
繁體
简体
You are Here:
National Chiao Tung University Institutional Repository
Browsing by Author Tai, Y. T.
Jump to:
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
or enter first few letters:
Sort by:
title
issue date
submit date
In order:
Ascending
Descending
Results/Page
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
Authors/Record:
All
1
5
10
15
20
25
30
35
40
45
50
Showing results 1 to 20 of 25
next >
Issue Date
Title
Author(s)
4-七月-2019
An analytical closed-form solution for multiple line supplier selection problem
Pearn, W. L.
;
Tai, Y. T.
;
Tseng, S. C.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-十一月-2014
Approximately Unbiased Estimator for Non-Normal Process Capability Index C-Npk
Pearn, W. L.
;
Tai, Y. T.
;
Hsiao, I. F.
;
Ao, Y. P.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
15-三月-2013
The burn-in test scheduling problem with batch dependent processing time and sequence dependent setup time
Pearn, W. L.
;
Hong, J. S.
;
Tai, Y. T.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-十二月-2011
Capability Assessment for Processes with Multiple Characteristics: A Generalization of the Popular Index C(pk)
Pearn, W. L.
;
Shiau, J. -J. H.
;
Tai, Y. T.
;
Li, M. Y.
;
統計學研究所
;
工業工程與管理學系
;
Institute of Statistics
;
Department of Industrial Engineering and Management
1-Dec-2011
Capability Assessment for Processes with Multiple Characteristics: A Generalization of the Popular Index C-pk
Pearn, W. L.
;
Shiau, J. -J. H.
;
Tai, Y. T.
;
Li, M. Y.
;
統計學研究所
;
工業工程與管理學系
;
Institute of Statistics
;
Department of Industrial Engineering and Management
1-七月-2015
Convenient Ratio Approach for Industrial Implementation in Estimating and Testing Process Yield
Pearn, W. L.
;
Tai, Y. T.
;
Kao, C. M.
;
統計學研究所
;
工業工程與管理學系
;
Institute of Statistics
;
Department of Industrial Engineering and Management
2012
Cycle time estimation for semiconductor final testing processes with Weibull-distributed waiting time
Tai, Y. T.
;
Pearn, W. L.
;
Lee, J. H.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
2008
The Design of Outsourcing Planning for Semiconductor Backend Turnkey Service
Chung, S. H.
;
Chung, I. P.
;
Tai, Y. T.
;
Chu, Y. M.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Jul-2012
An Effective Powerful Test for Supplier Selection Evaluation with Multiple Characteristics
Pearn, W. L.
;
Tai, Y. T.
;
Wang, C. Y.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Jul-2009
An Effective Scheduling Approach for Maximizing Polyimide Printing Weighted Throughput in Cell Assembly Factories
Chung, S. H.
;
Tai, Y. T.
;
Pearn, W. L.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Nov-2011
An Effective Test for Supplier Selection Evaluation with Multiple Characteristics
Tai, Y. T.
;
Pearn, W. L.
;
You, S. K.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
九月-2016
Estimation of a Modified Capability Index for Non-Normal Distributions
Pearn, W. L.
;
Tai, Y. T.
;
Wang, H. T.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-七月-2009
Fast and effective algorithms for the liquid crystal display module (LCM) scheduling problem with sequence-dependent setup time
Chung, S. H.
;
Pearn, W. L.
;
Tai, Y. T.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
十月-2016
Group Supplier Selection for Multiple-Line Gold Bumping Processes
Pearn, W. L.
;
Tai, Y. T.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-May-2019
An Improved Manufacturing Yield Measure for Gold Bumping Processes With Very Low Nonconformities
Wu, C. H.
;
Pearn, W. L.
;
Tai, Y. T.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-Apr-2010
Measuring Manufacturing Yield for Gold Bumping Processes Under Dynamic Variance Change
Pearn, W. L.
;
Tai, Y. T.
;
Chiang, W. L.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
1-May-2012
Measuring the Manufacturing Yield for Processes With Multiple Manufacturing Lines
Tai, Y. T.
;
Pearn, W. L.
;
Kao, Chun-Min
;
統計學研究所
;
工業工程與管理學系
;
Institute of Statistics
;
Department of Industrial Engineering and Management
1-Aug-2015
Measuring the Manufacturing Yield for Skewed Wire Bonding Processes
Tai, Y. T.
;
Pearn, W. L.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
2009
Minimising makespan on parallel batch processing machines with non-identical ready time and arbitrary job sizes
Chung, S. H.
;
Tai, Y. T.
;
Pearn, W. L.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management
2016
A note on production yield measure for multiple lines
Pearn, W. L.
;
Tai, Y. T.
;
Wu, C. H.
;
工業工程與管理學系
;
Department of Industrial Engineering and Management