Title: Minimizing Total Earliness and Tardiness for Common Due Date Single-Machine Scheduling with an Unavailability Interval
Authors: Low, Chinyao
Li, Rong-Kwei
Wu, Guan-He
工業工程與管理學系
Department of Industrial Engineering and Management
Issue Date: 1-Jan-2016
Abstract: This paper addresses the problem of scheduling.. independent jobs on a single machine with a fixed unavailability interval, where the aim is to minimize the total earliness and tardiness (TET) about a common due date. Two exact methods are proposed for solving the problem: mixed integer linear programming formulations and a dynamic programming based method. These methods are coded and tested intensively on a large data set and the results are analytically compared. Computational experiments show that the dynamic programming method is efficient in obtaining the optimal solutions and no problems due to memory requirement.
URI: http://dx.doi.org/10.1155/2016/6124734
http://hdl.handle.net/11536/145550
ISSN: 1024-123X
DOI: 10.1155/2016/6124734
Journal: MATHEMATICAL PROBLEMS IN ENGINEERING
Appears in Collections:Articles