Skip navigation
瀏覽
學術出版
教師專書
期刊論文
會議論文
研究計畫
畢業論文
專利資料
技術報告
數位教材
開放式課程
專題作品
喀報
交大建築展
明竹
活動紀錄
圖書館週
研究攻略營
畢業典禮
開學典禮
數位典藏
楊英風數位美術館
詩人管管數位典藏
歷史新聞
交大 e-News
交大友聲雜誌
陽明交大電子報
陽明交大英文電子報
項目
公開日期
作者
標題
關鍵字
研究人員
English
繁體
简体
目前位置:
國立陽明交通大學機構典藏
學術出版
期刊論文
標題:
On the optimal lot-sizing and scheduling problem in serial-type supply chain system using a time-varying lot-sizing policy
作者:
Huang, Jia-Yen
Yao, Ming-Jong
運輸與物流管理系 註:原交通所+運管所
Department of Transportation and Logistics Management
關鍵字:
serial-type supply chain;economic lot scheduling problem;inventory control;time-varying lot-sizing policy;scheduling
公開日期:
1-二月-2013
摘要:
In this paper, we solve the optimal sequencing, lot-sizing and scheduling decisions for several products manufactured through several firms in a serial-type supply chain so as to minimise the sum of setup and inventory holding costs while meeting given demand from customers. We propose a three-phase heuristic to solve this NP-hard problem using a time-varying lot- sizing approach. First, based on the theoretical results, we obtain candidate sets of the production frequencies and cycle time using a junction-point heuristic. Next, we determine the production sequences for each firm using a bin-packing method. Finally, we obtain the production times of the products for each firm in the supply chain system by iteratively solving a set of linear simultaneous equations which were derived from the constraints. Then, we choose the best solution among the candidate solutions. Based on the numerical experiments, we show that the proposed three-phase heuristic efficiently obtains feasible solutions with excellent quality which is much better than the upper-bound solutions from the common cycle approach.
URI:
http://dx.doi.org/10.1080/00207543.2012.662604
http://hdl.handle.net/11536/21243
ISSN:
0020-7543
DOI:
10.1080/00207543.2012.662604
期刊:
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH
Volume:
51
Issue:
3
起始頁:
735
結束頁:
750
顯示於類別:
期刊論文
文件中的檔案:
存到雲端
000313036700007.pdf
若為 zip 檔案,請下載檔案解壓縮後,用瀏覽器開啟資料夾中的 index.html 瀏覽全文。
IR@NYCU
CrossRef
Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach / Yao, Ming-Jong;Chang, Yu-Jen
A COMMON CYCLE APPROACH FOR SOLVING THE ECONOMIC LOT AND INSPECTION SCHEDULING PROBLEM / Yao, Ming-Jong;Chen, Shih-Chieh;Chang, Yu-Jen
多階即時生產供應鏈體系最佳運籌模式與策略之研究 / 姚銘忠;YAO MING-JONG
求解同時生產一般與再生產品最佳生產批量與排程問題之研究 / 黃朝楥;Huang, Jhao-Syuan;姚銘忠;林仁彥;Yao, Ming-Jong
A case study on the multistage IC final testing scheduling problem with reentry / Pearn, WL;Chung, SH;Chen, AY;Yang, MH
Loading...